@susanh

Public

San Anselmo

1 idea shared

1 idea shared

Susan Heath
8 giờ trước

Raise Smart Train tracks ABOVE street level - clogs the ever increasing traffic. Increase the wait times for lights feeding into 2nd street and 3rd street during commute hours. Need better throughput onto 101 South to get the cars onto the freeway and decrease the 5-10" waiting time to get through 4-5 blocks.